GT 123-72-75/1.5-6600 QID Drop In Drum Coiled Tubing Reel Skid – Quick Detachable 1.5″ × 6600m High Pressure CT Reel
Coiled Tubing Unit
GT 123-72-75/1.5-6600 QID Drop In Drum Coiled Tubing Reel Skid – Quick Detachable 1.5" × 6600m High Pressure CT Reel
Product Overview
The GT 123-72-75/1.5-6600 QID Drop In Drum Tubing Reel Skid is a quick-detachable heavy-duty coiled tubing reel designed for onshore oil & gas well intervention, fully compliant with SY/T industry standards and ISO9001:2015 quality management system.
As a classic Drop In Drum (QID quick-in drum) structure, the reel body can be rapidly separated from the main skid frame, drastically reducing reel swap downtime for multi-well continuous construction. The whole integrated skid integrates reel base, dual hydraulic drive assembly, dual inlet 15000PSI high-pressure manifold, multi-stage chain forced level wind, 100L remote pneumatic tubing lubrication system, pressure & flow sensors, dual mechanical & encoder depth counter, optional explosion-proof video monitoring and dedicated lifting slings.
All structural components undergo sandblasting & pickling anti-corrosion pretreatment with heavy-duty industrial coating, stably operating under -20℃ ~ 55℃ harsh conditions including sandstorm, rain, snow and coastal high-humidity environment. The layout fully complies with global HSE safety standards, equipped with operation platforms, maintenance ladders and standardized warning signs, all sharp edges blunted to eliminate operator injury risks. Widely applied in shallow & medium-depth well cleanout, bridge plug milling, acidizing, fracturing, gas lift and snubbing coiled tubing operations.
Main Technical Parameters
Parameter Item
Technical Data
Model
GT 123-72-75/1.5-6600 QID Drop In Drum Coiled Tubing Reel Skid
18 months after delivery or 12 months after first operation (whichever comes first)
Core Advantages
QID Quick Detachable Drop In Drum Structure
Exclusive quick-disassembly drop-in drum design, reel body and main skid frame fixed by positioning pins for fast separation & replacement. Operators can swap different preloaded CT reels on-site within short time, avoiding long downtime for tube rewinding, greatly improving fleet construction efficiency. Integrated quick connection panel for hydraulic & electric circuits, 15m matched hose & cable bundles support instant docking with CT unit power system.
Dual Hydraulic Motor Heavy-Duty Drive System
Equipped with two low-speed high-torque hydraulic motors matched with planetary gear reducers, driving reel via external slewing ring gear for stable large torque output. Built-in spring hydraulic release brake prevents free reel slipping under heavy load, eliminating tubing rebound safety hazards. Low vibration, stable low-speed operation, suitable for long-hour continuous spooling of 1.5" CT.
Complete 15000PSI High Pressure Manifold Assembly
Right-side integrated double inlet high-pressure manifold with standard 2" FIG1502 union connections. Configured with STONE brand 15000PSI rotary joint, PARKER pressure relief needle valve, EDD high-pressure flowmeter, plus full set of tees, 90° long radius elbows and plug valves. Real-time pressure & flow data monitoring, zero leakage under ultra-high pressure, fully meets fracturing & acidizing high-pressure construction demands.
Multi-stage chain transmission automatic level wind with hydraulic lifting adjustment, tubing horizontal guide angle adjustable 10°–80° to fit different wellhead heights and multi-layer tubing winding. Equipped with hydraulic motor driven manual forced spooling system, ensures neat tubing arrangement without overlapping, extrusion or fatigue damage. High-finish counting roller avoids oil pollution interference, guarantees consistent depth measurement accuracy.
Remote Pneumatic Lubrication System (100L Tank)
100L large-capacity pneumatic lubrication tank installed at reel front, fully controllable from remote operation cabin. Uniformly coats lubricant on outer CT surface during spooling, effectively reducing tubing friction loss and extending coiled tubing service life. Complete drainage & pressure regulating valves for easy daily maintenance.
Dual measurement system combining 5-digit mechanical counter and electronic encoder, dual-side synchronous installation for double verification to avoid counting errors. Optional YTS-A1/S explosion-proof HD video camera mounted behind reel, 20m composite cable transmits real-time spooling footage to control room display, operators monitor pipe arrangement remotely to prevent tube jamming accidents.
Full Anti-Corrosion & HSE Compliant Maintenance Design
Whole machine undergoes sandblasting + pickling rust removal before anti-corrosion paint spraying, resistant to saline fog, desert sand and freezing cold environments. Double-side maintenance ladders, integrated operation platform and safety chains are standard equipped; all hydraulic quick couplings with dust-proof caps, centralized grease ports for bearings & chain to simplify daily lubrication. Complete lifting slings and transport locking chains supplied for safe sea & land transportation.
Application Scenarios
Onshore conventional oil & gas well cleanout, paraffin removal & routine workover
Medium-depth well bridge plug milling, fishing, logging & perforation operations
Oil well acidizing, fracturing, nitrogen gas lift stimulation & flowback treatment
Shale oil, coalbed methane & unconventional reservoir coiled tubing construction
Onshore snubbing operation, non-stop production well maintenance & intervention
Standard Delivery Package
Complete GT 123-72-75 QID Drop In Drum coiled tubing reel skid main frame & reel body
Dual hydraulic drive unit, slewing ring gear & safety brake assembly
Full 15000PSI high-pressure manifold, STONE rotary joint, EDD flowmeter & PARKER needle valve
15m hydraulic hose bundle & electrical signal cable harness with quick connection panel
Lifting sling, transport locking chains, full set installation fasteners & oil receiving pan
Complete OEM spare parts kit for routine maintenance
English operation & maintenance manual, factory certificate, ISO9001 certification & component original documents
Warranty & Global After-Sales Service
Warranty Period: 18 months after delivery or 12 months after first field operation, whichever expires first. Free repair and component replacement for manufacturing & design defects within warranty (excluding consumable wearing parts: seals, chain, friction plates, guide sleeves).
On-Site Training: Factory arranges professional technicians to provide 7-day on-site equipment operation & maintenance training for buyer's team during acceptance.
Global Technical Support: Remote video troubleshooting worldwide, overseas on-site service available for large oilfield projects; free technical guidance for the first two well operations after delivery.
Customization Support: Support NACE anti-sulfur modification, CCTV installation, tubing size adaptation, hydraulic circuit parameter adjustment and customized anti-corrosion coating standards.
Delivery Lead Time: In stock, FOB Tianjin Port delivery within 7~10 working days upon advance payment receipt.
FAQ
What is the maximum coiled tubing capacity of this QID Drop In Drum reel skid?
This quick detachable reel can hold maximum 6600 meters of 1.5" outer diameter coiled tubing, also compatible with 1.25" CT with matched guide sleeves.
What core international brand components are adopted?
Key high-pressure parts adopt well-known global brands: STONE rotary joint, PARKER pressure relief needle valve, EDD high precision flowmeter, stable and reliable for long-term high-pressure oilfield operation.
What is the biggest advantage of QID Drop In Drum design?
The reel drum can be quickly detached from the main skid frame, clients can prepare multiple preloaded spare reels to realize fast reel replacement on site, drastically cutting construction downtime compared with integrated fixed reels.
Can the reel work in cold northern oilfields and desert environments?
Yes, operating temperature covers -20℃ ~ 55℃, heavy anti-corrosion coating resists snow, frost, sandstorm and coastal salt fog, applicable for all onshore oilfield climatic conditions.
Is the pipe arrangement fully automatic?
Multi-stage chain transmission automatic forced level wind with hydraulic lifting adjustment, equipped with manual forced spooling backup system, realizes neat automatic tubing winding without manual intervention.
Inquiry CTA Section
Looking for efficient QID Drop In Drum coiled tubing reel skid to reduce your rig downtime? We supply full series high-pressure CT reel equipment, support customized technical solution and factory competitive price. Send your well depth, tubing specification and working environment to our engineering team to get detailed datasheet & factory quotation within 24 hours.
Interested in this product?
Contact us for pricing, technical details, and delivery.