Downhole Tools

Sino Petroleum supplies 120 downhole tools and BHA components for coiled tubing and wireline intervention — connectors and subs, circulation valves, wash and jetting tools, fishing, jarring, packers and hangers, milling, centralizers and motors. Every tool is machined for 1¼″ to 2⅝″ CT, rated to the working pressure of your string, and available in standard or H₂S sour-service metallurgy.

120 tools in stock range · 9 categories · 1¼″ – 2⅝″ CT · 5K – 15K psi · H₂S service
25 items

Connectors & Subs

Coiled tubing connectors, dimple and slip connectors, knuckle joints, crossovers, adapters, clamps and BHA subs for 1-1/4" to 2-7/8" CT strings.

View tools →
17 items

Wash & Jetting Tools

Wash tools, rotary jetting tools, sand jet perforating subs and tungsten-carbide nozzles for casing cleanout, cement sheath cutting and wellbore displacement.

View tools →
17 items

Fishing Tools

Overshots, spears, grapple assemblies, magnets, junk baskets and impression blocks for retrieving stuck tools and debris from live wells.

View tools →
14 items

Packers & Hangers

Retrievable packers, velocity-string hanger packers, barrier and pump plugs, surface hangers and wellhead work windows for zonal isolation and CT suspension.

View tools →
13 items

Valves & Circulation

Circulation valves, flapper and dart check valves, burst discs, disconnect subs and sliding-sleeve shifting tools for flow control in CT bottom hole assemblies.

View tools →
12 items

Jarring & Vibration

Hydraulic and mechanical jars, accelerators, hydraulic oscillators and shock tools that free stuck strings and reduce friction during coiled tubing intervention.

View tools →
9 items

Milling & Cutting

Concave, convex, flat-bottom and combination mills, thru-tubing cutters and underreamers for milling plugs, scale, cement and restriction removal.

View tools →
7 items

Motors & Motorheads

Positive displacement drilling motors, motorhead assemblies, PDM protectors and flow dividers for CT drilling and logging conveyance.

View tools →
6 items

Centralizers

Bow-spring, rigid fluted and hydraulic centralizers that keep CT and completion strings centred for better cement coverage and tool performance.

View tools →

Connection not listed? We machine it to order.

Send us your CT size, thread form and working pressure — our engineers will confirm a drawing within 48 hours.

How to select the right downhole tool

Start from the operation, not the catalogue. For wellbore cleanout and scale removal, pair a wash tool with a jetting sub and a motorhead assembly. For stuck-string recovery, a hydraulic jar plus an accelerator, followed by an overshot or spear matched to the fish diameter. For zonal isolation and velocity-string work, a retrievable packer or hanger packer with a barrier plug below it. If you are unsure which combination fits your well, send us the CT size, hole size, pressure and temperature — our engineers will return a BHA drawing and a quotation within 24 hours.

Looking for the coiled tubing unit itself? See the 40K–160K coiled tubing units, the 180K liquid nitrogen pumping units, or the pressure control equipment that completes the spread.

CTU Sales AssistantOnline · typically replies in minutes
✅ Enquiry received. Our engineer will reply within 24 hours.
Free quote · 24h response · No obligation